Construction
The most important part of the railway is railway track which plays a role in giving a reliable surface for train to run. ACRC is provide the up to date technology and machinery for constructing, laying and building the railway track system as well as building the ballasted and ballastless track system. ACRC also provide the construction of:
- Pre-construction activities (subgrade drainage and materials preparation)
- Cutting, filling and preparation of subgrade as per design level
- Laying bottom ballast
- Production of sleepers
- Transportation and laying of sleepers
- Anchorage (fixing railroad spike to railway sleeper)
- Laying steel rail
- Fasten railroad track system
- Laying top ballast